Project Scheduler
Salary Range: $85,000 - $135,000
This posting is for an existing job vacancy.
For more than 90 years, E.S. Fox Limited (ESFL) has set the standard for safety and quality in the construction and fabrication industry.
E.S. Fox Limited Nuclear Services Division is a people-first, environmentally conscious, socially responsible, Engineering, Procurement, and Construction (EPC) provider in the nuclear sector. E.S. Fox Limited’s Nuclear Services has contributed millions of hours in support of Ontario’s safe and reliable nuclear power industry! We provide our clients with a streamlined solution for their detailed engineering, fabrication, construction, and maintenance needs. As the nuclear power generation sector evolves, we are primed to support the transition.
Our Strength is People
With a strong commitment to health, safety, and the protection of the environment, ESFL Nuclear Services has earned a reputation as an employer of choice, valuing our employees’ diverse contributions of skill, abilities, and experience.
As our employees are our greatest asset, we strive to foster, cultivate, and preserve a culture of diversity, equity, and inclusion so that all employees feel valued and respected.
Why Join Our Team
We offer you a rewarding career opportunity working within the thriving construction industry. We provide comprehensive benefits, including:
- An attractive health and dental benefits package for you and your family (dependents)
- Health Care Spending Account and Healthy Living Wellness Account options
- Employee Assistance Program
- Group RSP with employer contribution
- Competitive compensation
- Support of professional growth
Our Nuclear Services office in Bowmanville, Pickering, ON, is looking for a Project Scheduler to join our team.
Summary of the Role
Reporting to the Director, Project Controls and Scheduling, the Project Scheduler is responsible for developing and maintaining the project schedule while also recording and tracking contract and scope changes. The Project Scheduler will be responsible for supporting the Project Team with various project related activities throughout the project life cycle.
Key Responsibilities
- Work with project management team, planners and estimators in developing project plans (cost, schedule, and risk, scope and change management plans).
- Work with project management team in developing project’s internal controls processes and procedures.
- Track and evaluate cost and schedule trends and variances and adjust forecasts as required.
- Conduct analysis and prepare progress reports on costs, schedule and risks.
- Support project close-out reporting and documentation activities as required.
- An understanding of critical path methodology to ensure, and communicate, timely delivery of milestone tasks.
Key Requirements, Experience and Skills
- Bachelor’s Degree in Engineering, Construction, Management, or equivalent.
- Analytical, with the ability to work with database and prepare reports.
- Proven understanding of project management, engineering and construction processes preferred.
- Security cleared with Ontario Power Generation (OPG) considered an asset
- Intermediate / Advanced level of experience working with Primavera P6 for at least 6 years.
- Experience in cost and schedule development and monitoring practices and procedures preferred.
- Nuclear experience and Project Management Professional (PMP) credential considered an asset.
- Requires strong computer skills, especially Excel, and MS Project.
Attributes
- Excellent interpersonal relations.
- Team player and collaborates well with other members of the department.
- Works well under time constraints.
- Initiative-taker.
Competencies
About E.S. Fox Limited
ESFL is a privately owned, Canadian, multi-trade fabricator and constructor, providing a single-source solution for Industrial, Institutional, Commercial, and Power Generation sectors. ESFL has established a reputation for safety, executing high quality workmanship, operational flexibility, efficiency, and timely project completion.
ESFL Nuclear Services has offices in Oshawa and Kincardine along with on-site locations at the OPG, Bruce Power Nuclear Generating Stations, and Canadian Nuclear Laboratories. ESFL Nuclear Services provides a full spectrum of EPC services, in addition to maintenance and manufacturing services, fit to meet the growing requirements of the global nuclear power industry.
Connect: LinkedIn, esfox.com
In accordance with legislation and our commitment to transparent hiring practices, the compensation range for this position is provided. Final compensation will be determined based on qualifications, experience, and internal equity. Canadian work experience is not required. Please note that artificiation intelligence tools are not utilized in the applicant screening process.
E.S. Fox Limited is an equal opportunity employer committed to providing an inclusive workplace. We will accommodate applicants with disabilities throughout the recruitment and selection process. Please advise Human Resources to ensure your accessibility needs are accommodated throughout this process.
NCLR